To see all content, you will need the current version of Adobe Flash Player to view it.

SIGNALLING ON THE LINE SIGNALLING PLANS LATEST PROJECTS NEWS MATLOCK RIVERSIDE DARLEY DALE CROSSING BOX CHURCH LANE CROSSING BOX ROWSLEY SOUTH THE DEPARTMENT THE TELEGRAPH DEPARTMENT Main Page BEFORE CLOSURE 1 BEFORE CLOSURE 2 BEFORE CLOSURE 3 SIGNALBOXES RECOVERED GLENDON NORTH RECOVERY LUFFENHAM MUSINGS BAMFORD MUSINGS S&T LINKS 

DARLEY DALE CROSSING BOX

Darley Dale crossing cabin controls one end of a passing loop (where trains can pass), this is worked between Church Lane and Darley Dale on the up line using absolute block working and equipment, the single line section to Matlock is worked using a combined electric staff key (for the electrical interlocking) and Annettes key (to release the ground frames at Matlock Riverside station and Darley Dale south yard sidings)

The level crossing at Darley Dale together with the passing loop and sidings are controlled from the level crossing cabin (RIGHT),this ia a new structure to replace the old ground level cabin.